Mr. Mohan Kumar Dangi

Executive Chairman

Other hydropower companies that Mr. Dangi is directly involved in are: Beni Hydropower Company Pvt. Ltd. which includes Upper Solu Khola Hydropower Project (19.8 MW), that is under generation phase; Lalupate Hydropower Company Pvt. Ltd. which includes Dana Khola HPP (49.95 MW) that is undergoing construction; Dona Lake Hydropower Company Pvt. Ltd. which includes Super Dona Khola HPP (42 MW) that is in survey phase; Pelma Hydropower Company Pvt. Ltd. which includes Pelma Khola HPP (80 MW) & Upper Sani Bheri HPP (150 MW) that are under detailed survey, engineering & design phase.

His valuable contributions, leadership skills, energetic personality as well as his positive attitude towards the Energy sector of Nepal have highly been appreciated. Mr. Dangi strongly believes that the hydropower & energy sector is the only sector that will develop and speed-up the economic prosperity in Nepal. Mr. Dangi continues to make substantial contributions to both society as well as the Energy sector. Mr. Dangi’s hydropower portfolio contains a total of 42.2 MW capacity project under generation phase, a total of 51.95 MW capacity project under construction phase and a total of 272 MW capacity project under study phase.

Mr. Mohan Kumar Dangi (Senior Vice-President of IPPAN) boasts an impressive and successful career in the Hydropower sector of Nepal with almost two decades of experience in the Energy sector. Mr. Dangi began his active journey in the hydropower sector ever since he initiated as well as became the Managing Director of Terhathum Power Company Ltd. (TPC) which includes Upper Khorunga Khola SHPP (7.5 MW), that underwent timely completion in record time and cost constraints. TPC has a cascade project Khorunga-Tangmaya Khola SHPP (2.00 MW) that is under construction.

Work Status

Terhathum Power Company Limited

Upper Khorunga Khola SHPP (7.5 MW) in

generation since 2076)

Managing Director

In generation since 2076)

Khorunga–Tangmaya Khola (2.00MW)

Khorunga –Tangmaya Khola

under Costruction)

Pelma Hydropower Project Pvt. Ltd

Upper Sani Bheri PRoR HPP (60 MW)

Upgrading to 150 MW

Executive Chairman

Under Study

Pelma PRoR HPP (40 MW)

Upgrading to 80 MW

Under Study

Beni Hydropower Company Pvt. Ltd

Upper Solu Khola HPP (19.8 MW)

Under Operation

Director

Under operation since

Ashad -1, 2080

Independent Power Producers

Association Nepal (IPPAN)

Senior Vice President

(From 2079-2082)

Nepal’s Energy Catalyst since

2001

Terhathum Sarokar Samaj Nepal

Chief Advisor

(From 2079-2081)

Running (Estd. 2061)

Nepal Modern Pentathlon Association

Senior Vice President

(From 2079-2082)

Estd. 2015

Amber-Laxmi Enterprises Pvt. Ltd.

Executive Director (Estd. 2005)

Running

Shiva Baba Property Dealer Pvt. Ltd.

Director (Estd. 2008)

Running