Mr. Mohan Kumar Dangi
Executive Chairman
Other hydropower companies that Mr. Dangi is directly involved in are: Beni Hydropower Company Pvt. Ltd. which includes Upper Solu Khola Hydropower Project (19.8 MW), that is under generation phase; Lalupate Hydropower Company Pvt. Ltd. which includes Dana Khola HPP (49.95 MW) that is undergoing construction; Dona Lake Hydropower Company Pvt. Ltd. which includes Super Dona Khola HPP (42 MW) that is in survey phase; Pelma Hydropower Company Pvt. Ltd. which includes Pelma Khola HPP (80 MW) & Upper Sani Bheri HPP (150 MW) that are under detailed survey, engineering & design phase.
His valuable contributions, leadership skills, energetic personality as well as his positive attitude towards the Energy sector of Nepal have highly been appreciated. Mr. Dangi strongly believes that the hydropower & energy sector is the only sector that will develop and speed-up the economic prosperity in Nepal. Mr. Dangi continues to make substantial contributions to both society as well as the Energy sector. Mr. Dangi’s hydropower portfolio contains a total of 42.2 MW capacity project under generation phase, a total of 51.95 MW capacity project under construction phase and a total of 272 MW capacity project under study phase.

Mr. Mohan Kumar Dangi (Senior Vice-President of IPPAN) boasts an impressive and successful career in the Hydropower sector of Nepal with almost two decades of experience in the Energy sector. Mr. Dangi began his active journey in the hydropower sector ever since he initiated as well as became the Managing Director of Terhathum Power Company Ltd. (TPC) which includes Upper Khorunga Khola SHPP (7.5 MW), that underwent timely completion in record time and cost constraints. TPC has a cascade project Khorunga-Tangmaya Khola SHPP (2.00 MW) that is under construction.
Work Status
Terhathum Power Company Limited
Upper Khorunga Khola SHPP (7.5 MW) in
generation since 2076)
Managing Director
In generation since 2076)
Khorunga–Tangmaya Khola (2.00MW)
Khorunga –Tangmaya Khola
under Costruction)
Pelma Hydropower Project Pvt. Ltd
Upper Sani Bheri PRoR HPP (60 MW)
Upgrading to 150 MW
Executive Chairman
Under Study
Pelma PRoR HPP (40 MW)
Upgrading to 80 MW
Under Study
Beni Hydropower Company Pvt. Ltd
Upper Solu Khola HPP (19.8 MW)
Under Operation
Director
Under operation since
Ashad -1, 2080
Independent Power Producers
Association Nepal (IPPAN)
Senior Vice President
(From 2079-2082)
Nepal’s Energy Catalyst since
2001
Terhathum Sarokar Samaj Nepal
Chief Advisor
(From 2079-2081)
Running (Estd. 2061)
Nepal Modern Pentathlon Association
Senior Vice President
(From 2079-2082)
Estd. 2015
Amber-Laxmi Enterprises Pvt. Ltd.
Executive Director (Estd. 2005)
Running
Shiva Baba Property Dealer Pvt. Ltd.
Director (Estd. 2008)
Running