Salient Features
a. | Name of the Project | : | Dana Khola Hydropower Project |
b. | Name of the River | : | Dana, Prabe and Chyojyo Khola |
c. | Type of Scheme | : | Run-of-river (RoR) |
d. | Project Location | : | Nashong Rural Municipality, Manang |
e. | License Boundary Coordinates | : | Latitude- 280 30′ 00” N to 280 31′ 18” N |
|
|
| Longitude- 840 21′ 39” E to 840 24′ 20” E |
f. | Nearest Settlement | : | Nache Village |
g. | Access Road Name | : | Access road Khotro-Dharmashala |
a. | Developer | : | Lalupate Hydropower Company Pvt. Ltd. |
b. | Consultant | : | Clean Energy Consultants Pvt. Ltd. |
a. | Catchment Area at Intake | : | 122.86 Km2 |
| Catchment Area at Dana Intake Site (sq. km) | : | 116.02 Km2 |
| Catchment Area at Prabe Intake (sq. km) | : | 4.80 Km2 |
| Catchment Area at Chyojyo Intake (sq. km) | : | 2.04 Km2 |
b. | Catchment Area at Powerhouse Site (sq.km) | : | 2265.90 Km2 |
c. | Design Discharge | : | 6.03 m3/s |
| Design Discharge at Dana Intake (m3/s) | : | 5.71 m3/s at Q43.7% |
| Design Discharge at Prabe Intake (m3/s) | : | 0.22 m3/s at Q40% |
| Design Discharge at Chyojyo Intake (m3/s) | : | 0.10 m3/s at Q40% |
d. | Average Annual Discharge (m3/s) | : | 10.68 m3/s |
| Average Annual Discharge at Dana Intake | : | 10.23 m3/s |
| Average Annual Discharge at Prabe Intake | : | 0.31 m3/s |
| Average Annual Discharge at Chyojyo Intake | : | 0.14 m3/s |
e. | Minimum Monthly Discharge (m3/s) at Dana | : | 2.48 m3/s |
f. | Maximum Monthly Discharge (m3/s) at Dana | : | 27.58 m3/s |
g. | Minimum Environmental Release (m3/s) | : | 0.26 m3/s |
h. | Flood Discharge for Dana Headworks Design (100 years) | : | 366.6 m3/s |
i. | Flood Discharge for Prabe Headworks Design (100 years) | : | 26.2 m3/s |
j. | Flood Discharge for Chyojyo Headworks Design (100 years) | : | 11.1 m3/s |
k. | Flood Discharge for Powerhouse/Tailrace Design (100 years) | : | 3444.4 m3/s |
l. | Construction Flood Discharge for Dana Headworks (20 years) | : | 34.2 m3/s |
m. | Construction Flood Discharge for Powerhouse/Tailrace (20 years) | : | 418.9 m3/s |
a. | Average Annual Sediment Yield (ppm) | : | 273.1 ppm |
b. | Design Suspended Sediment Load (ppm) | : | 5000 ppm |
c. | Estimated Annual Sediment Yield (Million Ton/Yr) | : | 0.324 million ton/yr |
a. | Regional Geology | : | Higher Himalayan Sequence |
b. | Major Rock Types in Headworks | : | Gneiss |
c. | Major Rock Types in Waterways | : | Quartzite gneiss, Schistose Gneiss, Banded Gneiss, Cal-gneiss, Massive bedded Marble |
d. | Major Rock Types in Powerhouse | : | Quartzite, Gneiss and Banded Gneiss |
a. | Dam/Weir | : | Boulder Lined Weir |
b. | Crest Level (masl) | : | 2821.50 masl |
c. | Type | : | Diversion weir with side intake |
d. | Length (m) | : | 16.11 m |
e. | Lowest River Bed Level at Weir Axis (masl) | : | 2817.77 masl |
f. | Foundation Type | : | Alluvium and boulders |
g. | Provision of Stilling Basin | : | N/A |
a. | Intake Type | : | Side Intake with trashrack |
b. | Number of Orifice | : | 2 nos. |
c. | Size (B x H, m) | : | 3.00 x 1.80 m |
d. | Top Sill Level (masl) | : | 2821.31 masl |
e. | Invert Sill Level (masl) | : | 2819.50 masl |
f. | Gate Type | : | Vertical sliding |
g. | Hoisting System | : | Motorized gear hoist |
h. | Trashrack Dimension and Opening (L x B, m) | : | 2 nos. 3.0 m X 2.3 m |
i. | Clear Opening of Trashrack (mm) | : | 100 mm |
j. | Trashrack cleaning mechanism | : | Manual |
a. | Number of Bays | : | 1 no. |
b. | Dimension (L x B, m) | : | 2.50 m x 3.00 m |
c. | Undersluice Invert Level (masl) | : | 2816.25 masl |
d. | Gate Type | : | Vertical Sliding |
e. | Hoisting System | : | Motorized gear hoist |
a. | Type | : | Underground |
b. | Settling Criteria | : | Upto 20 mm size |
c. | Number of Basin | : | 1 no. |
d. | Gravel Trap Size (L x B x H, m) | : | 40.5 m x 4.00 m x 3.50 m |
e. | Size of Flushing Tunnel (B x H, m) | : | 3.00 m x 3.00 m |
a. | Type | : | Underground Dufour double bay |
b. | Settling Criteria | : | Upto 0.15 mm size |
c. | Size of Particle to Settle (mm) | : | 0.15 mm |
d. | Settling Design Temperature (ᵒC) | : | 15ᵒC |
e. | Trapping Efficiency (mm) | : | 90% (minimum) |
f. | Number of Bays | : | 2 nos. |
g. | Inlet Transition Length (m) | : | 12.5 m |
h. | Settling Basin Size (L x B, m) | : | 100.00 m x 7.00 m x 12.30 m |
i. | Flushing System | : | Sand Flushing Tunnel |
j. | Size of Flushing Channel (B x H) | : | 3.00 m x 2.90 m |
k. | Longitudinal Slope (V:H) | : | 1:50 |
l. | Support Type (if underground) | : | Rock bolts and shotcrete as per requirement |
a. | Prabe Khola | : | Collection from Adit 1 |
b. | Chyojyo Khola | : | Collection from Adit 2 |
a. | Type | : | Inverted D-shaped Tunnel |
b. | Length (m) | : | 3312 m |
c. | Finished Dimension/Diameter (m) | : | 3.00 m x 3.00 m shotcrete lined, and 2.6 m X 2.6 m concrete lined |
d. | Inlet Invert Level (masl) | : | 2818.294 masl |
e. | Outlet Invert Level (masl) | : | 2794.33 masl |
f. | Support Type (if underground) | : | Rock bolts, shotcrete, and concrete lining as per requirement |
a. | Adit 1 (Prabe Collection) including access tunnel to diversion tunnel and access to headrace tunnel from desander access tunnel | : | 960 m |
b. | Adit 2 (Chyojyo Collection) | : | 463.37 m |
c. | Adit 3 (Surge Tunnel) | : | 579.27 m |
d. | Adit 4 | : | 385.67 m |
e. | Adit 5 | : | 455.18 m |
f. | Adit 6 (Main Access Tunnel) | : | 442.22 m |
a. | Type | : | Surge Tunnel D-shaped, Concrete Lined |
b. | Length (m) & Dia. (m) | : | 591 m, 3.00 m Dia. |
c. | Upsurge Level (masl) | : | 2825.45 masl |
d. | Downsurge Level (masl) | : | 2816.45 masl |
a. | Material | : | Mild steel welded pipe lining, E450 |
b. | Length (m) | : | 1624.14 m |
c. | Internal Diameter (m) | : | 1.7 m |
d. | Thickness (mm) | : | 10-66 mm |
e. | Number of Anchor Blocks | : | 6 nos. |
f. | Number of Saddle Supports | : | N/A |
h. | Support Type (if underground) | : | Rock bolts and shotcrete as primary rock support and Concrete fill in between pipe and rock |
a. | Type | : | Underground with Indoor GIS Switchyard |
b. | Plan Dimensions (L x B x H, m) | : | 51.50 m x 14.00 m x 23.67 m |
c. | Machine Floor Level (masl) | : | 1833.38 masl |
d. | Overhead Hoisting Type | : | Overhead Travelling Crane |
e. | Overhead Hoisting Capacity (Metric Tons) | : | 50 ton |
f. | Foundation Type | : | Rock foundation |
g. | Support Type (if underground) | : | Rock bolts and shotcrete as per requirement |
a. | Type | : | Free-flow Tunnel |
b. | Numbers | : | 1 no. |
c. | Size (B x H, m) | : | 3.00 m x 3.00 m |
d. | Length (m) | : | 415.00 m |
e. | Outlet Water Level at River | : | 1785 masl |
f. | Maximum Allowed Tail Water Level (masl) | : | 1822.00 masl |
h. | Invert Level of Tailrace at Outlet (masl) | : | 1819.60 masl |
i. | Support Type | : | Rock bolts and shotcrete as per requirement |
a. | Type | : | Vertical axis Pelton |
b. | Number of Unit | : | 3 nos. |
c. | Maximum Head (m) | : | 995.25 m |
d. | Minimum Head (m) | : | 988.27 m |
e. | Rated Net Head (m) | : | 988.27 m |
f. | Rated Capacity per Unit (Kilowatts) | : | 18000 kW |
g. | Discharge per Unit (m3/s) | : | 2.01 m3/s |
h. | Turbine Axis Elevation (masl) | : | 1825 masl |
i. | Turbine Efficiency (%) | : | 90% |
a. | Type of Generators | : | 3-Phase AC synchronous |
b. | Number of Unit | : | 3 nos. |
c. | Rated Output (kVA) | : | 19.588 MVA+10% COL |
d. | Generation Voltage (kV) | : | 11 kV |
e. | Frequency (Hz) | : | 50 Hz |
f. | Excitation System | : | Brushless excitation |
g. | Speed (rpm) | : | 600 rpm |
h. | Generator Efficiency (%) | : | 96% |
a. | Type | : | Outdoor Step-up Power Transformer, single phase |
b. | Number of Phase | : | 6+(1 spare) |
c. | Number of Units | : | 6 nos., 2 Banks |
d. | Rated Output (MVA) | : | 11 MVA |
e. | Frequency (Hz) | : | 50 Hz |
f. | Vector Group | : | YNd11 |
g. | Voltage Ratio | : | 220/11 kV |
h. | Transformer Efficiency | : | 99% |
a. | Dimensions | : | 50.00 m x 12.50 m |
a. | Transmission Voltage (kV) | : | 220 kV |
b. | Length (km) | : | 5.5 km |
c. | Connection Point (Location) | : | 220/132/33 kV Dharapani Substation |
d. | Number of Poles/Towers | : | 13 nos. |
a. | Installed Capacity (Kilowatts) | : | 49950 kW |
b. | Gross Head (m) | : | 996.50 m |
c. | Dry Season Energy (GWh) | : | 92.485 GWh as per PPA 108.47 GWh as per UFSR |
d. | Wet Season Energy (GWh) | : | 208.387 GWh as per PPA 211.62 GWh as per UFSR |
e. | Total Deemed Annual Energy (GWh) | : | 300.872 GWh as per PPA 320.10 GWh as per UFSR |
a. | Government Land Requirement (Ha) | : | 4.8 Ha |